keep the distance, stop to coronavirus. disinfector male in gas-mask and protective suit disinfect contaminated areas full of bacterias. quarantine time

Emergency Fumigation Scheme

Consultancy
Healthcare & Pharma

Biosafe in 3 simple steps

Welcome to Biosafe, Normec Groups Emergency Recovery scheme for customers with a containment level 3/Hazard Group 3 facility.

  1. 1

    Get In Touch

    Call, email or fill in a contact form and one of our experts will contact you.

  2. 2

    Pick Your Plan

    Talk through your requirements with one of the team, they can advise which plan is best suited to you

  3. 3

    We've Got You Covered

    Your Biosafe plan will ensure you’re covered, 365 days a year

CL3/HG3 Emergency Fumigation Plan

The range of options are:

Fumigation service

A full lab service available with a membership option which gives access to priority scheduling and 24/7 telephone support.

Sealability integrity test -

  • An integrity test for a lab which will confirm ACDP compliance which includes:

  • Visual inspection of the fabric, finishes and structure

  • Fabric integrity leak testing using a smoke pencil or similar ACDP approved methodology

  • Differential pressure measurement

  • Undertake a simulated fumigation cycle to shut down and re start the laboratory using the clients existing fumigation protocol

  • Confirm the correct operation and control of dampers, fumigation sockets

Efficacy Study

Validation of a fumigation plan is needed for ACDP compliance, this option includes:

  • The provision of an emergency fumigation procedure

  • Confirmation of the fumigation procedure efficacy

  • Identify “dead” spots within the laboratory and recommend remedial actions

  • Carry out a simulated emergency fumigation using chemical and biological indicators as appropriate to demonstrate efficacy

  • Provision of an efficacy study report

Optional Extras

  • HEPA filter testing (extract and/or supply)

  • Safety cabinet service and validation to include KI Discus testing on a six-monthly basis as recommended in the ACDP guidance

  • Magnehelic gauge zero and verification

  • Pressure decay test

  • Retests following leak repair of failures

See what your facility needs

Would you like more information on the various spare parts we offer? Please get in touch with one of our experts!
Request quote

Leading companies in this service

Related articles